Environmental
Albany Convention Center Authority
Site Selection Criteria
Acreage:
5-6 (based on the October 2002 Report of the Albany Convention
Center Task Force recommendation)
Access:
- General, daily traffic and parking
- Load in / out capacity and ease
- Center event related traffic and parking
- Demands on feeder highways (I787, I90, I87)
- Review of key intersections
- Availability and location of complementary and support
businesses (i.e. hotels, restaurants, retail)
Context:
How does the
center work within downtown / government complex/ neighborhoods. To be
considered:
- Historic preservation
- Visual
- Risk management, security
- Community services
- Context to other structures
- Priority of minimal demolition of significant buildings
- Construction related impacts
- Availability of technology (wireless and line availability)
- Utilities / storm water
- Archeology
- Environmental impact downtown / adjoining neighborhood
- Cumulative and growth impact analysis
Other factors: Results of Preliminary Environmental Impact Study
DGEIS
ACCA ADOPTS FINAL GENERIC ENVIRONMENTAL IMPACT STATEMENT
AND ADOPTS FACILITIES PLAN
ACCA ADOPTS FINAL GENERIC ENVIRONMENTAL IMPACT STATEMENT
AND ADOPTS FACILITIES PLAN
FGEIS **** THIS PAGE IS CURRENTLY UNDERGOING UPDATES. WE APPRECIATE YOUR PATIENCE.
Draft Generic Environmental Impact Statement ("DGEIS")
All
documents are in PDF* format. Some files are very large and may take some time
to open completely.
Table of Contents and Section 1: 1.0 Introduction; 1.1 Project History and Need; 1.2 Description of Action; 1.3 Anticipated Benefits; 1.4 Planning Period; 1.5 SEQR Process
Section 2: 2.0 Master Plan Considerations; 2.1 Alternative Previously Considered; 2.2 Existing Facilities; 2.3 Site Selection Process; 2.4 Vision Statement; 2.5 Master Plan Methodology; 2.6 Study Area; 2.7 Urban Design Analysis; 2.8 Guiding Principles; 2.9 Urban Design Framework; 2.10 Public Participation; 2.11 Master Plan Alternatives
Section 3: 3.0 Facility and District Master Plan; 3.1 Development Program; 3.2 Anticipated Events; 3.3 Guiding Principles; 3.4 Optimized Growth Plan; 3.5 Cultural Resource Strategy; 3.6 Community Benefits Program; 3.7 Implementation Plan
Section 4(a): 4.0 Environmental Setting, Impacts & Mitigation; 4.1 Transportation, Parking and Pedestrian; 4.2 Cultural Resources
Section 4(a): 4.0 Environmental Setting, Impacts & Mitigation; 4.1 Transportation, Parking and Pedestrian; 4.2 Cultural Resources
Section 4(b): 4.3 Aesthetic and Visual Resources; 4.4 Land Use and Zoning; 4.5 Community Services; 4.6 Utilities and Infrastructure; 4.7 Air Quality; 4.8 Construction Impacts
Section 5:5.0 Unavoidable Adverse Environmental Impacts
Appendices
- Final Scoping Document
- 2001 Strategic Advisory Group (SAG) Market Feasibility Study
- 2002 ALDC Task Force Study
- 2004 SAG Update
- Developers Proposal
- HVS International Market Study
- BBP Supportable Development Range
- Traffic Impact Study
- Hartgen
Phase 1A Assessment [due to the size of the document, it is not available electronically]
- Phase 1B Work Plan
- Residential Market Study
- Correspondence
- Preliminary Study Green Hudson Parking Garage
- Public Meeting and Workshop Minutes
Albany Convention Center Master Plan
Draft Generic Environmental Impact Statement
June 29, 2007
Final Scoping Document [pdf*132kb]
Resolution [pdf*51kb]
Albany Convention Center Master Plan
Draft Generic Environmental Impact Statement
February 23, 2007
Draft Scoping Document [pdf*111KB]
Master Plan
Status Report to the Authority - 6/29/07
Pages 1 through 23 [pdf 294kb]
Pages 24 through 46 [pdf 744kb]
Pages 47 through 69 [pdf 684kb]
Community Meeting Schedule - Completed
The Albany Convention Center announces Community Meetings for
its Master Planning efforts. Click
here to get involved!
April 26, 2007 Workshop
Workshop Attendance List [PDF 41kb]
Workshop Report [PDF
746kb]
Master Plan Concept 1 Diagram [PDF
117kb]
Master Plan Concept 1 Diagram [PDF
123kb]
Recommendation of the Site Selection
Sub-Committee
The site selection sub-committee of the Albany
County Convention Center Authority (ACCA) is ready to make a
recommendation to the full authority board that will narrow the
preferred site for the development of Albany’s convention center.
The sub-committee had based this
recommendation on the following factors:
- Site selection criteria developed by the sub-committee
and reviewed and adopted by the ACCA in March 2006. A copy
is Attached.
- Public comment provided to the sub-committee at its
6/27 public comment meeting.
- Further comment provided by the NYS Office of General
Services.
It is important to note that this
narrower preferred site is being established for the purposes of
preparing a Generic Environmental Impact Statement (GEIS) which is key
to the Plan for Development that the ACCA is charged with producing.
The boundaries, we believe, are those that will be helpful in
understanding how a convention center will work within the confines of
Albany’s compact downtown area. The Center will be located within the
preferred site; the center will not encompass the entire site.
In its deliberations, the committee
noted several priority criteria that will be identified to the GEIS
consulting team as important to the ACCA and more generally to Albany.
- Historic resources within the preferred site. Several
including Plaza Row (Broadway), Liberty Park (Hudson Ave.) and 48 Hudson
Avenue will require careful review and analysis.
- Connectivity to downtown, to and between other major
assembly facilities (Pepsi Arena and Empire State Plaza Convention
Center and to governmental buildings.)
The preferred site for the
preparation of a GEIS that the sub-committee is recommending is bounded
on the south by Madison Avenue, on the north by State Street, on the
east by Broadway and on the west by South Pearl Street. The
sub-committee believes that this preferred site will provide the most
cost effective building solution; that is required minimal demolition
and that it will ultimately provide new amenities and enhanced public
facilities for nearby residents.
It should be noted that this is just the
beginning of the process initiating the Plan for Development and that
no immediate action is anticipated that will impact any parcel or
building within the preferred site for GEIS study.
Preferred Site with Boundaries Only [pdf*160
KB]